Home > News > Content

Triangle Piece-counting Packing Machine Maintenance

- Oct 18, 2017 -

I. Lubrication

1. Lubricate the gears, bearings and the moving parts regularly.
2. The Deceleration Device must not run with no oil. After running 300 hours for the first time, clean the inside of the device and put in new oil. After that change oil every 2500 hours.
3. Do not to drop the lubricant onto the Driving Belt.


II. Clean

1. Clean such parts as the Bucket, Turning-plate etc that touch the packing materials each time after turning off the machine.
2. Regularly clean the Thermal Sealer to ensure the nice sealing track.
3. Immediately clean the materials scattered and keep the parts tidy to maintain the lifespan of the machine.
4. Regularly clean the Photo Senor to make it work better.
5. Regularly remove the dust in the Electric Control Box to avoid short circuits or poor connection.


III. Maintenance

1. Regularly check the screws of every part in case they are loose.
2. Make sure that the Electric Control Box and the wire connections are clean and dry to avoid electrical malfunction.


Maintenance Lists


triangle packing machine maintenance.png


Clients Feedbacks


Triangle packing machine checklist.png

Related News

Related Products

  • Chocolate Ball Mill Machine
  • Chocolate Bean Polishing Machine
  • Fully Automatic Rice Cracker Complete Production Line
  • Beverage Pre-Treatment System
  • Blending Tank
  • Sugar Melting Tank